12 masonry Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about 12 masonry? On this page you'll find 673 study documents about 12 masonry.
All 673 results
Sort by
-
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023
- Exam (elaborations) • 10 pages • 2023
- Available in package deal
-
- $30.49
- 3x sold
- + learn more
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 
Estimating: 
The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. 
 
 
 
Take-off: 
The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. 
 
 
 
Quantities: 
Measured amounts of construction...
-
OSHA 30 Construction Test Questions and Answers Latest 2023/2024
- Exam (elaborations) • 54 pages • 2023 Popular
-
- $15.99
- 3x sold
- + learn more
OSHA 30 Construction Test Questions and Answers Latest 2023/2024 
 
 
1 Module 1: Introduction To OSHA 30 Test Answers 
2 Module 2: Managing Safety and Health Answers 
3 Module 3: OSHA Focus Four Hazards Answers 
4 Module 4: Personal Protective Equipment Answers 
5 Module 5: Health Hazards in Construction Answers 
6 Module 6: Stairways and Ladders Answers 
7 Module 7: Concrete and Masonry Construction Answers 
8 Module 8: Confined Spaces Answers 
9 Module 9: Cranes, Derricks, Hoists, Elevators a...
-
ICC EXAM QUESTIONS AND ANSWERS
- Exam (elaborations) • 6 pages • 2023
-
- $10.99
- 1x sold
- + learn more
Penthouses constructed on buildings of other than Type I Construction shall not exceed __ feet in height above the roof deck. - Answer- 18 
(Section 1510.2.1 Height above roof deck) 
 
In exterior walls and bearing partitions, any wood stud is permitted to be cut or notched to a depth not exceeding __ percent of it's width. - Answer- 25 
Section 2305.5.9 
 
The ends of wood girders entering exterior masonry of concrete walls shall be provided with a __ inch airspace on top, side and end - Answ...
-
MI Residential Builder Test Prep Questions With Complete Solutions
- Exam (elaborations) • 7 pages • 2023
- Available in package deal
-
- $10.49
- 2x sold
- + learn more
A foundation drain shall extend past the outside edge of the footing at least how far? correct answer: 12" 
 
A concrete masonry foundation wall extends below grade and will require parge coating using Portland cement mortar. What is the minimum allowable thickness? correct answer: 3/8" 
 
Which is the first step that needs to be taken prior to starting any excavation work? correct answer: contacting the local utility companies 
 
Before excavating for a new building, how should subsoil con...
-
Contractor's License Exam Questions and Answers 100% Pass
- Exam (elaborations) • 34 pages • 2024
- Available in package deal
-
- $10.99
- 1x sold
- + learn more
Contractor's License Exam Questions 
 
and Answers 100% Pass 
 
Attachments to structural members 
The edges of lugs brackets, rivets and bolt heads attached to structural members shall be 
permitted to extend to within 1 inch of the surface of the fire protection 
Parapet construction 
The height of the parapet shall not be less than 30 inches above the point where the roof surface 
and the wall intersect. 
Combustible framing in fire walls 
Adjacent combustible members entering into a concret...
Too much month left at the end of the money?
-
Demolition Operations Actual Exam Questions With Answers
- Exam (elaborations) • 19 pages • 2023
- Available in package deal
-
- $12.99
- 1x sold
- + learn more
Demolition Operations Actual 
Exam Questions With Answers 
Which method of attack is preferred on a steel truss deck bridge with top supports? - 
ANSWER- bottom attack 
Using the Hasty method, how many total packages of C4 (M112) would be required to 
breach a reinforced concrete wall, which is 7 feet thick, and 16 feet wide, using elevated 
untamped charges? - ANSWER- 200 
What is the value of "k" when you are destroying a 5-foot thick dense concrete wall 
using external charge? - ANSWER-...
-
Michigan Builder 2 Residential Contractors License Study Exam|2023 LATEST UPDATE|GUARANTEED SUCCESS
- Exam (elaborations) • 13 pages • 2023
- Available in package deal
-
- $12.49
- 1x sold
- + learn more
An attached garage shall be separated from all habitable rooms above the garage with not less than 
5/8 of an inch gypsum board 
 
 
 
A structure that is intended for swimming or recreational bathing is considered to be a swimming pool if it contains water over 
24 inches 
 
 
 
What type of fastener do you use to install cabinets? 
Truss head wood screws 
 
 
 
The process of preparing sand underneath a concrete slab requires sand to be 
Compacted 
 
 
 
Habitable space in a basement shall hav...
-
Professional Home Inspector Exam NHIE / TREC Questions with correct Answers
- Exam (elaborations) • 43 pages • 2023
- Available in package deal
-
- $15.49
- 1x sold
- + learn more
The inspector is not required to determine ____ ___ of any system or component. - Answer- -Years of age 
-Life expectancy 
-Make model 
 
Horizontal waste pipe should slope ____ inch per foot - Answer- 1/4" per foot if < 3 inch pipe. 
1/8" per foot if > or = to 3 inch pipe 
 
Drip screed - Answer- Also called weep screed. 
Used at the base/bottom of stucco walls to release moisture. 
 
Pressure Vacuum Breaker (PVB) - Answer- Used for Backflow Prevention. 
Lawn Irrigation systems: install...
-
Michigan residential builders maintenance and alterations 5 practice exam with 100% correct answerss
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $13.99
- 1x sold
- + learn more
SITEWORK, FOOTING, AND FONDATIONS 
FIRST SECTION 
 
 
 
A foundation drain shall extend past the outside edge of the footing at least how far? 
12 inches 
 
 
 
What are batter boards? 
Stakes and ledger boards marking building lines. 
 
 
 
What is the purpose of a cove or can't strip at a foundation joint? 
Deflect water from the foundation wall. 
 
 
 
What is the MINIMUM overlap for the joints in the polyethylene film moisture barrier applied over the exterior of a below grade foundation wa...
-
Professional Home Inspector Exam NHIE / TREC Questions and Answers Already Passed
- Exam (elaborations) • 63 pages • 2022
-
- $6.99
- 6x sold
- + learn more
Professional Home Inspector Exam NHIE / TREC Questions and Answers Already Passed 
Document Content and Description Below 
Professional Home Inspector Exam NHIE / TREC Questions and Answers Already Passed The inspector is not required to determine ____ ___ of any system or component. -Years of age -Life expecta ncy -Make model Horizontal waste pipe should slope ____ inch per foot 1/4" per foot if < 3 inch pipe. 1/8" per foot if > or = to 3 inch pipe Drip screed Also called weep screed. U...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia