My mission is to be your LIGHT in the dark. If you"re worried or having trouble in nursing school, I really want my notes to be your guide! I know they have helped countless others get through and thats all i want for YOU! Stay with me and you will find everything you need to study and pass any tests,quizzes abd exams!

Tutor StudyCenter1 helps you study by writing summaries of study material

StudyCenter1 helps with

Show more

Community

  • Followers
  • Following

12 Reviews received

10 items

CDT Practice Delivery Study Guide Exam latest update

(0)
$14.49
0x  sold

CDT Practice Delivery Study Guide Exam latest update m2-Which of the following is not a construction schedule milestone: a) submittal approval b) Project Delivery and team selection process c) Procurement (Bidding/negotiating/purchasing) Activities. d) Contract Completion - CORRECT ANSWER-Project Delivery and team selection process m6-If a date to proceed is not stipulated in the agreement, the owner should issue to the contractor a: - CORRECT ANSWER-Notice to Proceed m6-Pre-constru...

i x
  • Exam (elaborations)
  •  • 12 pages • 
  • by StudyCenter1 • 
  • uploaded  06-05-2024
Quick View
i x

CDT Practice Exam with Verified Q&A

(0)
$11.49
0x  sold

CDT Practice Exam with Verified Q&A Experienced owners may require project teams to utilize integrated project delivery based upon: a. Previous negative experience with adversarial project team relationships b. Desire for reduction in project claims and disputes c. Desire to utilize collaboratively-produced BIM as a facilities management asset d. Expectation of benefit from innovation stemming from collaborative effort e. All of the above - CORRECT ANSWER-e. All of the above - Collaborat...

i x
  • Exam (elaborations)
  •  • 5 pages • 
  • by StudyCenter1 • 
  • uploaded  06-05-2024
Quick View
i x

CDT Ceramics Exam study booklet Final Test

(0)
$10.49
0x  sold

CDT Ceramics Exam study booklet Final Test Vertical Overlap - CORRECT ANSWER-term for overbite Rx - CORRECT ANSWER-shorthand for prescription The process of heat-treating the cast metal substructure in a porcelain furnace as one of the preparatory steps to apply the opaque porcelain is referred to as: - CORRECT ANSWER-Oxidation (oxidizing) In the Munsell Color Order System, hue refers to: - CORRECT ANSWER-The different colors of the color wheel The articulator which is easy to use a...

i x
  • Exam (elaborations)
  •  • 4 pages • 
  • by StudyCenter1 • 
  • uploaded  06-05-2024
Quick View
i x

CDT Ceramics certification Exam Q&A Solved and Verified

(0)
$12.99
0x  sold

CDT Ceramics certification Exam Q&A Solved and Verified what is iodophor used for? - CORRECT ANSWER-Disinfecting the hardest tissue in the mouth is: - CORRECT ANSWER-enamel a supplemental groove is: - CORRECT ANSWER-secondary anatomy or grooves if using bleach as a disinfectant in the dental lab, you should dilute 1 part of bleach with ________ parts of water. - CORRECT ANSWER-2 the tooth with the largest cingulum is the: - CORRECT ANSWER-maxillary canine the individuals credited with ...

i x
  • Exam (elaborations)
  •  • 9 pages • 
  • by StudyCenter1 • 
  • uploaded  06-05-2024
Quick View
i x

CDT Practice Questions and Answers latest Actual Exam

(0)
$17.99
0x  sold

CDT Practice Questions and Answers latest Actual Exam Sheet keynote or reference keynote - CORRECT ANSWER-a notation on a single drawing sheet "A facility's "life cycle" includes all of the following EXCEPT: a. Project conception b. Financing c. Construction d. Facility management" - CORRECT ANSWER-1. b - PRM 1.4 Life cycle Stages: Conceptions, Delivery Method, Design, Psrocurement, Construction, What does CSI's UDS do ? what does it stand for ? - CORRECT ANSWER-UDS uniform d...

i x
  • Exam (elaborations)
  •  • 31 pages • 
  • by StudyCenter1 • 
  • uploaded  06-05-2024
Quick View
i x

CDT Exam Prep chapter 1-4 Questions and Elaborated Answers

(0)
$16.99
0x  sold

CDT Exam Prep chapter 1-4 Questions and Elaborated Answers Bidding documents are considered legal documents? ▪ True. ▪ False. - CORRECT ANSWER-False Codes governing commercial construction and residential construction are different? ▪ True. ▪ False. - CORRECT ANSWER-True The A/E usually hires a construction manager? - CORRECT ANSWER-False The Owner, Contractor and A/E are parties to the construction agreement? ▪ True. ▪False. - CORRECT ANSWER-False There are no differenc...

i x
  • Exam (elaborations)
  •  • 27 pages • 
  • by StudyCenter1 • 
  • uploaded  06-05-2024
Quick View
i x

CDT Practice Exam Final questions and answers A-graded

(0)
$17.49
0x  sold

CDT Practice Exam Final questions and answers A-graded Which of these documents, might we find in the Project Manual but they are not contract documents? (A) The Agreement (B) Procurement Documents (C) Addendum (D) Supplemental Conditions - CORRECT ANSWER-Answer: B Reference: PDPG 11.1.6 Explanation: Procurement requirements are addressed to prospective bidders or proposers interested in the project. Although not necessarily part of a contract, the procurement requirements are usua...

i x
  • Exam (elaborations)
  •  • 29 pages • 
  • by StudyCenter1 • 
  • uploaded  06-05-2024
Quick View
i x

CSI CDT Exam Study Guide (questions and answers) 100% solved

(0)
$14.99
0x  sold

CSI CDT Exam Study Guide (questions and answers) 100% solved Owner - CORRECT ANSWER-Principle stakeholder - initiates project, assumes risk, provides funding AHJ - Authorities Having Jurisdiction - CORRECT ANSWER-Protect public health, safety and welfare Design Team - CORRECT ANSWER-Address planning issues, determine design program, identify codes and regulations, produce procurement and construction documents, administer construction contract, *provide QA/QC procedures* Contractor...

i x
  • Exam (elaborations)
  •  • 15 pages • 
  • by StudyCenter1 • 
  • uploaded  06-05-2024
Quick View
i x

CDT Exam questions and Answers 100% Correct

(0)
$17.99
0x  sold

CDT Exam questions and Answers 100% Correct Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...

i x
  • Exam (elaborations)
  •  • 53 pages • 
  • by StudyCenter1 • 
  • uploaded  06-05-2024
Quick View
i x

CDT exam Questions with Correct Answers (solved)

(0)
$14.99
0x  sold

CDT exam Questions with Correct Answers (solved) 1. The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: a) Agreement. b) Conditions of the Contract. c) Division 01. d) Instructions to Bidders. - CORRECT ANSWER-b) Conditions of the Contract. 2. General Requirements are part of: a) Supplementary Conditions. b) Bidding Requirements. c) Specifications. d) Summary of Work. - CORRECT AN...

i x
  • Exam (elaborations)
  •  • 16 pages • 
  • by StudyCenter1 • 
  • uploaded  06-05-2024
Quick View