PROJ430 Advanced Project Management

Devry University

Voici les meilleures ressources pour passer PROJ430 Advanced Project Management. Trouvez guides d'étude pour PROJ430 Advanced Project Management, notes, devoirs et bien plus encore.

All 2 résultats

Trier par

Final Exam |Elaborated| PROJ430  - Advanced Project Management
  • Final Exam |Elaborated| PROJ430 - Advanced Project Management

  • Examen • 39 pages • 2021
  • Final Exam |Elaborated| PROJ430 - Advanced Project Management PERT and CPM are quantitative analysis tools designed to schedule and control large projects. ANSWER: TRUE 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. ANSWER: FALSE 13.3 PERT had its beginnings in a military department of the United States. ANSWER: TRUE 13.4 CPM is a probabilistic analysis of managing a project. ANSWER: FALSE 13.5 An event is a point in time that marks th...
    (0)
  • $12.49
  • + en savoir plus
Final Exam |Elaborated| PROJ430  - Advanced Project Management
  • Final Exam |Elaborated| PROJ430 - Advanced Project Management

  • Examen • 39 pages • 2021
  • Final Exam |Elaborated| PROJ430 - Advanced Project Management PERT and CPM are quantitative analysis tools designed to schedule and control large projects. ANSWER: TRUE 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. ANSWER: FALSE 13.3 PERT had its beginnings in a military department of the United States. ANSWER: TRUE 13.4 CPM is a probabilistic analysis of managing a project. ANSWER: FALSE 13.5 An event is a point in time that marks th...
    (0)
  • $12.49
  • + en savoir plus